Decision:
Approved, in line with the officer recommendation, subject to conditions and S106 legal agreement, details to be set out in the minutes.
Minutes:
The Committee considered application 22/03063/F, for the erection of 123 dwellings (formerly 126) with access from Camp Road, provision of public open space and associated infrastructure at Land East Of Larsen Road, Heyford Park for David Wilson Homes (Southern).
David Hutchison from Pegasus Planning Group on behalf of Dorchester Group, interested party, addressed the Committee in objection to the application.
Estelle Hutchinson, on behalf of the applicant, David Wilson Homes (Southern), addressed the Committee in support of the application.
In reaching its decision the Committee considered the officers’ report, presentation, address of the public speakers and the written updates.
Resolved
That, in line with the officer’s recommendation, application 22/03063/F be delegated to the Assistant Director for Planning and Development to grant permission subject to:
i. Conditions set out below (and any amendment to those conditions as may be deemed necessary);
ii. The completion of a planning obligation under section 106 of the Town and Country Planning Act 1990, as substituted by the Planning and Compensation Act 1991, to secure the heads of terms listed at paragraph 9.95 of the officer’s report (and any amendments as deemed necessary);
iii. Naturespace licence agreement.
It was further resolved that f the section 106 agreement/undertaking was not completed by 31 March 2024 and the permission was not able to be issued by the date and no extension of time had been agreed between the parties, the Assistant Director for Planning and Development be given delegated authority to refuse the application for the following reason:
1. In the absence of a satisfactory unilateral undertaking or any other form of Section 106 legal agreement the Local Planning Authority is not satisfied that the proposed development provides for appropriate infrastructure required as a result of the development and necessary to make the impacts of the development acceptable in planning terms, to the detriment of both existing and proposed residents and contrary to Policy INF1 of the adopted Cherwell Local Plan 2011-2031, CDC Planning Obligations SPD 2018 and Government guidance within the NPPF.
Conditions:
1. The development to which this permission relates shall be begun not later than the expiration of three years beginning with the date of this permission.
Reason: To comply with the provisions of Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2. Except where otherwise stipulated by conditions attached to this permission, the development shall be carried out strictly in accordance with the application forms and the following plans and documents:
· Planning Layout – 0778-102-COL
· Location Plan – 0778-101
· Housetype Booklet – 0778-HTB-ISSUE 3
· Garages – 0778-109A
· External Detailing – 0778-106A
· Boundary Fencing – Db Sd13 006B
· Boundary Walls – Db Sd13 004D
· Arboricultural Protection Plans – 22 0728 V4 and 22 0729 V4
· Refuse Vehicle Swept Path – 22 192 002B
· Fire Tender Swept Path – 22 192 004
· Drainage Strategy – 22 192 100C and 22 192 106C
Reason: For the avoidance of doubt, to ensure that the development is carried out only as approved by the Local Planning Authority and comply with Government guidance contained within the National Planning Policy Framework.
3. The development permitted shall not be begun until details of the following additional matters have been submitted to, and approved in writing by, the Local Planning Authority:
· A proposed east and west scheme of access for pedestrians and cyclists to Larsen Road.
Reason: For the avoidance of doubt, to enable the Local Planning Authority to give further consideration to these matters, to ensure that the development is carried out only as approved by the Local Planning Authority and to achieve a comprehensive integrated form of development in compliance with Policy Villages 5 of the adopted Cherwell Local Plan and to comply with Government guidance contained within the National Planning Policy Framework.
4. Prior to the commencement of the development hereby approved, a schedule of materials and finishes for the external walls and roof(s) of the development hereby approved together with samples of all bricks, render, paviors and slates shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved schedule.
Reason: To ensure that the materials are appropriate to the appearance of the locality and to ensure the satisfactory appearance of the completed development in accordance with Policy ESD15 of the Cherwell Local Plan 2011 – 2031 Part 1, Saved Policy C28 of the Cherwell Local Plan 1996 and Government guidance contained within the National Planning Policy Framework.
5. Prior to the commencement of the development hereby approved, a Landscaping Scheme shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, the scheme shall be carried out in accordance with the approved details.
Reason: To protect habitats of importance to biodiversity conservation from any loss or damage in accordance with Policy ESD10 of the Cherwell Local Plan 2011 – 2031 Part 1 and Government guidance contained within Section 15 of the National Planning Policy Framework.
6. All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in accordance with BS 4428:1989 Code of Practice for general landscape operations (excluding hard surfaces), or the most up to date and current British Standard, in the first planting and seeding seasons following the occupation of the building(s) or on the completion of the development, whichever is the sooner. Any trees, herbaceous planting and shrubs which, within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the current/next planting season with others of similar size and species.
Reason: To ensure that the agreed landscaping scheme is maintained over a reasonable period that will permit its establishment in the interests of visual amenity and to accord with Policy ESD15 of the Cherwell Local Plan 2011 – 2031 Part 1, Saved Policy C28 of the Cherwell Local Plan 1996 and Government guidance contained within the National Planning Policy Framework.
7. Prior to the first occupation of the development hereby approved, a landscape management plan, to include the timing of the implementation of the plan, long term design objectives, management responsibilities, maintenance schedules and procedures for the replacement of failed planting for all landscape areas, other than for privately owned, domestic gardens, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the landscape management plan shall be carried out in accordance with the approved details.
Reason: In the interests of the visual amenities of the area, to ensure the creation of a pleasant environment for the development and to comply with Policy C28 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.
8. Prior to the commencement of the development hereby approved full details of the provision, landscaping and treatment of the open space and play space within the site including the LAP and LEAP together with a timeframe for its provision shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the open space and play space shall be landscaped, laid out and completed in accordance with the approved details and retained at all times as open space and play space.
Reason: In the interests of amenity, to ensure the creation of a pleasant environment for the development with appropriate open space/play space and to comply with Policy BSC11 of the Cherwell Local Plan 2011 – 2031 Part 1 and Government guidance contained within the National Planning Policy Framework.
9. Prior to first occupation of the development hereby approved, a Landscape and Ecology Management Plan (LEMP) shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, the LEMP shall be carried out in accordance with the approved details.
Reason: To protect habitats of importance to biodiversity conservation from any loss or damage in accordance with Policy ESD10 of the Cherwell Local Plan 2011 – 2031 Part 1 and Government guidance contained within Section 15 of the National Planning Policy Framework.
10. Prior to the commencement of the development hereby approved, full specification details of the roads, footpaths and cycle paths including construction, surfacing, layout, drainage and road markings, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter and prior to the first occupation of the first house the development shall be constructed in accordance with the approved details.
Reason: In the interests of highway safety, to ensure a satisfactory standard of construction and layout for the development and to comply with Government guidance contained within the National Planning Policy Framework.
11. Prior to the commencement of the development hereby approved, full specification details of the vehicular accesses, driveways and turning areas to serve the dwellings, which shall include construction, layout, surfacing and drainage, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter and prior to the first occupation of any of the dwellings, the access, driveways and turning areas shall be constructed in accordance with the approved details.
Reason: In the interests of highway safety, to ensure a satisfactory standard of construction and layout for the development and to comply with Government guidance contained within the National Planning Policy Framework.
12. Prior to the first occupation of any of the dwellings hereby approved, all of the estate roads and footpaths (except for the final surfacing thereof) shall be laid out, constructed, lit and drained in accordance with Oxfordshire County Council's 'Conditions and Specifications for the Construction of Roads' and its subsequent amendments.
Reason: In the interests of highway safety, to ensure a satisfactory standard of construction and layout for the development and to comply with Government guidance contained within the National Planning Policy Framework.
13. Prior to the commencement of the development hereby approved, full specification details (including construction, layout, surfacing and drainage) of the parking and manoeuvring areas shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, and prior to the first occupation of the development, the parking and manoeuvring areas shall be provided on the site in accordance with the approved details and shall be retained unobstructed except for the parking and manoeuvring of vehicles at all times thereafter.
Reason: In the interests of highway safety and to comply with Government guidance contained within the National Planning Policy Framework
14. Prior to first occupation of any dwelling, a Travel Information Pack shall be submitted to and approved by the Local Planning Authority. The first residents of each dwelling shall be provided with a copy of the approved Travel Information Pack.
Reason: In the interests of sustainability, to ensure a satisfactory form of development and to comply with Government guidance contained within the National Planning Policy Framework.
15. Prior to first occupation, a record of the installed SuDS and site wide drainage scheme shall be submitted to and approved in writing by the Local Planning Authority for deposit with the Lead Local Flood Authority Asset Register. The details shall include:
(a) As built plans in both .pdf and .shp file format;
(b) Photographs to document each key stage of the drainage system when installed on site;
(c) Photographs to document the completed installation of the drainage structures on site;
(d) The name and contact details of any appointed management company information.
Reason: To ensure that the development/site is served by sustainable arrangements for the disposal of surface water, to comply with Policy ESD6 of the Cherwell Local Plan 2011 – 2031 Part 1, Saved Policy ENV1 of the Cherwell Local Plan 1996 and Government advice in the National Planning Policy Framework.
16. No building hereby permitted shall be occupied until details of the implementation, maintenance and management of the sustainable drainage scheme are submitted to and approved in writing by the local planning authority. The scheme shall be implemented and thereafter managed and maintained in accordance with the approved details. Those details shall include:
i) a timetable for its implementation, and
ii) a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime.
Reason: To ensure that the development/site is served by sustainable arrangements for the disposal of surface water, to comply with Policy ESD6 of the Cherwell Local Plan 2011 – 2031 Part 1, Saved Policy ENV1 of the Cherwell Local Plan 1996 and Government advice in the National Planning Policy Framework.
17. No development shall take place, including any works of demolition until a Construction Method Statement has been submitted to, and approved in writing by the Local Planning Authority. The statement shall provide for at a minimum:
a) The parking of vehicles of site operatives and visitors;
b) The routeing of HGVs to and from the site;
c) Loading and unloading of plant and materials;
d) Storage of plant and materials used in constructing the development;
e) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;
f) Wheel washing facilities including type of operation (automated, water recycling etc) and road sweeping;
g) Measures to control the emission of dust and dirt during construction;
h) A scheme for recycling/ disposing of waste resulting from demolition and construction works;
i) Delivery, demolition and construction working hours;
The approved Construction Method Statement shall be adhered to throughout the construction period for the development.
Reason: To ensure the environment is protected during construction in accordance with Saved Policy ENV1 of the Cherwell Local Plan 1996 and Government guidance contained within the National Planning Policy Framework. This information is required prior to commencement of the development as it is fundamental to the acceptability of the scheme.
18. No development shall take place (including demolition, ground works, vegetation clearance) until a Construction Environmental Management Plan (CEMP: Biodiversity) has been submitted to and approved in writing by the Local Planning Authority. The CEMP: Biodiversity shall include as a minimum:
a) Risk assessment of potentially damaging construction activities;
b) Identification of ‘Biodiversity Protection Zones’;
c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements);
d) The location and timing of sensitive works to avoid harm to biodiversity features;
e) The times during construction when specialist ecologists need to be present on site to oversee works;
f) Responsible persons and lines of communication;
g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person;
h) Use of protective fences, exclusion barriers and warning signs.
The approved CEMP: Biodiversity shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority.
Reason: To protect habitats of importance to biodiversity conservation from any loss or damage in accordance with Policy ESD10 of the Cherwell Local Plan 2011 2031 Part 1 and Government guidance contained within Section 15 of the National Planning Policy Framework. This information is required prior to commencement of the development as it is fundamental to the acceptability of the scheme.
19. Details of the external lighting including the design, position, orientation and any screening of the lighting shall be submitted to and approved in writing by the Local Planning Authority prior to commencement of those works. The lighting shall be installed and operated in accordance with the approved scheme at all times thereafter.
Reason: To protect the amenities of nearby residents and light sensitive ecology, in the interest of public safety and to comply with Policy ESD15 of the Cherwell Local Plan 2011 – 2031 Part 1, Saved Policies C28 and C30 of the Cherwell Local Plan 1996.
20. A method statement for enhancing the bat/bird/invertebrate provision per dwelling shall be submitted to and approved in writing by the Local Planning Authority prior to the development reaching slab level. Thereafter, the biodiversity enhancement measures approved shall be carried out prior to occupation and retained in accordance with the approved details.
Reason: To protect habitats of importance to biodiversity conservation from any loss or damage in accordance with Policy ESD10 of the Cherwell Local Plan 2011 – 2031 Part 1 and Government guidance contained within Section 15 of the National Planning Policy Framework.
21. Prior to the commencement of the development hereby permitted a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model shall be carried out by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and shall be submitted to and approved in writing by the Local Planning Authority. No development shall take place until the Local Planning Authority has given its written approval that it is satisfied that no potential risk from contamination has been identified.
Reason: To ensure that any ground and water contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use to comply with Saved Policy ENV12 of the Cherwell Local Plan and Section 15 of the National Planning Policy Framework. This information is required prior to commencement of the development as it is fundamental to the acceptability of the scheme.
22. If a potential risk from contamination is identified as a result of the work carried out under condition 21, prior to the commencement of the development hereby permitted, a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and to inform the remediation strategy proposals shall be documented as a report undertaken by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and submitted to and approved in writing by the Local Planning Authority. No development shall take place unless the Local Planning Authority has given its written approval that it is satisfied that the risk from contamination has been adequately characterised as required by this condition.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy ENV12 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.
23. If contamination is found by undertaking the work carried out under condition 22, prior to the commencement of the development hereby permitted, a scheme of remediation and/or monitoring to ensure the site is suitable for its proposed use shall be prepared by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and submitted to and approved in writing by the Local Planning Authority. No development shall take place until the Local Planning Authority has given its written approval of the scheme of remediation and/or monitoring required by this condition.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy ENV12 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.
24. If remedial works have been identified in condition 23, the development shall not be occupied until the remedial works have been carried out in accordance with the scheme approved under condition 23. A verification report that demonstrates the effectiveness of the remediation carried out must be submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy ENV12 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.
25. If, during development, contamination not previously identified is found to be present at the site, no further development shall be carried out until full details of a remediation strategy detailing how the unsuspected contamination shall be dealt with has been submitted to and approved in writing by the Local Planning Authority. Thereafter the remediation strategy shall be carried out in accordance with the approved details.
Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy ENV12 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.
26. No development shall be occupied until confirmation has been provided that either:- all water network upgrades required to accommodate the additional flows to serve the development have been completed; or - a development and infrastructure phasing plan has been agreed with Thames Water to allow development to be occupied. Where a development and infrastructure phasing plan is agreed no occupation shall take place other than in accordance with the agreed development and infrastructure phasing plan.
Reason: The development may lead to no / low water pressure and network reinforcement works are anticipated to be necessary to ensure that sufficient capacity is made available to accommodate additional demand anticipated from the new development".
27. Notwithstanding any previously agreed play space details, full details of the provision, landscaping, specification of play equipment and treatment of play space(s) within the site together with a timeframe for its provision shall be submitted to and approved in writing by the Local Planning Authority prior to commencement of those works. Thereafter the play space shall be landscaped, laid out and completed in accordance with the approved details and retained at all times as open space/play space.
Reason: In the interests of amenity, to ensure the creation of a pleasant environment for the development with appropriate open space/play space and to comply with Policy BSC11 of the Cherwell Local Plan 2011 – 2031 Part 1 and Government guidance contained within the National Planning Policy Framework.
28. No development hereby permitted shall take place except in accordance with the terms and conditions of the Council’s organisational licence (WML-OR94) and with the proposals detailed on plan ‘Larsen Road Phase 1 and 2 combined: Impact Plan for great crested newt district licensing’ Version 3 dated 19th October 2021.
Reason: In order to ensure that any adverse impacts on great crested newts are adequately mitigated and to ensure that site works are delivered in full compliance with the organisational licence WML-OR94.
29. No development hereby permitted shall take place unless and until a certificate from the Delivery Partner (as set out in the District Licence WML-OR94), confirming that all necessary measures in regard to great crested newt compensation have been appropriately dealt with, has been submitted to and approved by the local planning authority and the local authority has provided authorisation for the development to proceed under the district newt licence. The Delivery Partner certificate must be submitted to this planning authority for approval prior to the commencement of the development hereby approved.
Reason: In order to adequately compensate for any negative impacts to great crested newts.
30. No development hereby permitted shall take place except in accordance with Part 1 of the GCN Mitigation Principles, as set out in the District Licence WMLOR94 and in addition in compliance with the following: - Works which will affect likely newt hibernacula may only be undertaken during the active period for amphibians. - Capture methods must be used at suitable habitat features prior to the commencement of the development (i.e. hand/destructive/night searches), which may include the use of temporary amphibian fencing, to prevent newts moving onto a development site from adjacent suitable habitat, installed for the period of the development (and removed upon completion of the development). - Amphibian fencing and pitfall trapping must be undertaken at suitable habitats and features, prior to commencement of the development.
Reason: In order to adequately mitigate impacts on great crested newts.
31. Where an offence under Regulation 41 of the Habitat and Species Regulations 2010 is likely to occur in respect of the development hereby approved, no works of site clearance, demolition or construction shall take place which are likely to impact on [bats/newts] until a licence to affect such species has been granted in accordance with the aforementioned Regulations and a copy thereof has been submitted to the Local Planning Authority.
Reason: To ensure that the development does not cause harm to any protected species or their habitats in accordance with Policy ESD10 of the Cherwell Local Plan 2011 – 2031 Part 1 and Government guidance contained within the National Planning Policy Framework.