Agenda item


OS Parcel 5700 South West of Grange Farm, Street through Little Chesterton, Chesterton

Decision:

Approved, subject to conditions and a section 106 legal agreement, details to be set out in the minutes.

Minutes:

The Committee considered application 22/01144/F a full planning application for the erection of a new high quality combined research, development and production facility comprising of Class B2 floorspace and ancillary office floorspace with associated infrastructure including formation of signal-controlled vehicular access to the A41 and repositioning of existing bus stops; ancillary workshops; staff gym and canteen; security gate house; a building for use as an energy centre (details of the energy generation reserved for future approval); loading bays; service yard; waste management area; external plant; vehicle parking; landscaping including permanent landscaped mounds; sustainable drainage details; together with the demolition of existing agricultural buildings within the red line boundary; and the realignment of an existing watercourse at OS Parcel 5700 South West of Grange Farm Street Through

Little Chesterton, Chesterton for Tritax Symmetry Oxford North Limited and Siemens Healthineers.

 

Nick Wyke, agent for the applicant and Andre Lindeboom of Siemens Magnet Technology, addressed the Committee in support of the application.

 

It was proposed by Councillor Coton and seconded by Councillor Broad that application 22/01144/F be refused contrary to the officer’s recommendation as the site was on unallocated land and not in the local plan.  There was also concern around the impact on the local villages of Chesterton, Wendlebury and Weston.

 

On being put to the vote, the proposal was lost and the motion subsequently fell.

 

It was proposed by Councillor Corkin and seconded by Councillor Clarke that application 22/01144/F be approved.

 

On reaching its decision the Committee considered the officers report and presentation, the written updates, and the address of the public speakers.

 

Resolved

 

(1)      That authority be delegated to the Assistant Director for Planning and Development to grant permission for application  22/01144/F subject to:

 

i)        The completion of a planning obligation under section 106 of the Town and Country Planning Act 1990, as substituted by the Planning and Compensation Act 1991, to secure the infrastructure set out in appendix 1 and amendments in the written updates (and any amendments to those obligations as deemed necessary.

 

ii)        The following conditions (and any amendments to those conditions as deemed necessary):

 

Time Limit

1.          The development to which this permission relates shall be begun not later than the expiration of three years beginning with the date of this permission.

 

Reason: To comply with the provisions of Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

Compliance with Plans

2.          Except where otherwise stipulated by conditions attached to this permission, the development shall be carried out strictly in accordance with the following plans and documents:

·     Access Plan - Drawing 205223/PD09 Rev C

·     13-222-SGP-STE-00-DR-A-131002 - Location Plan – Symmetry Park, Oxford North (Rev. P8)

·     13-222-SGP-ZZ-ZZ-DR-A-131007 – Watercourse Diversion Planning Location Plan (Rev. P1)

·     13-222-SGP-ZZ-ZZ-DR-A-131009- 01 – Location Plan

·     13-222-SGP-ZZ-ZZ-DR-A-121404 – Energy Centre Proposed Plan & Elevations (Rev. A)

·     13-222-SGP-ZZ-ZZ-DR-A-131000 - Site Plan – Phase 1 (Rev. V)

·     13-222-SGP-ZZ-ZZ-DR-A-131001 - Site Plan – Phase 2 (Rev. V)

·     13-222-SGP-ZZ-ZZ-DR-A-131003 - External Furniture & Boundary Treatment Plan – Phase 2 (Rev. M)

·     13-222-SGP-ZZ-ZZ-DR-A-131105 – Phase 1 – Production Area Layout (Rev. F)

·     13-222-SGP-ZZ-ZZ-DR-A-131106 – Phase 1 & 2 – Office Layout (Rev. D)

·     13-222-SGP-ZZ-ZZ-DR-A-131107 – Phase 1 – Gross External Area Plans (Rev. C)

·     13-222-SGP-ZZ-ZZ-DR-A-131108 – Phase 1 - GIA Plans and Critical Dimensions (Rev. E)

·     13-222-SGP-ZZ-ZZ-DR-A-131109 – Phase 1 – Roof Plan (Rev. G)

·     13-222-SGP-ZZ-ZZ-DR-A-131110 – Phase 2- Production Area Layout Rev. E)

·     13-222-SGP-ZZ-ZZ-DR-A-131112 – Phase 2 – Gross External Area Plans (Rev. C)

·     13-222-SGP-ZZ-ZZ-DR-A-131113 – Phase 2 – GIA Plans & Critical Dimensions (Rev. D)

·     13-222-SGP-ZZ-ZZ-DR-A-131114 – Phase 2 – Roof Plan (Rev. H)

·     13-222-SGP-ZZ-ZZ-DR-A-131115 - Phase 1 & 2 – Facilities Management Building (Rev. D)

·     13-222-SGP-ZZ-ZZ-DR-A-131116 - Phase 1 & 2 – Gatehouse (Rev. B)

·     13-222-SGP-ZZ-ZZ-DR-A-131200 – Phase 1 – Production Area Sections (Rev. D)

·     13-222-SGP-ZZ-ZZ-DR-A-131201 – Phase 1 & 2 – Office Sections (Rev. C)

·     13-222-SGP-ZZ-ZZ-DR-A-131202 – Phase 2 - Production Area Sections (Rev. D)

·     13-222-SGP-ZZ-ZZ-DR-A-131204 – Phase 1 & 2 - Atrium Sections (Rev. E)

·     13-222-SGP-ZZ-ZZ-DR-A-131300 – Phase 1 – Elevations (Rev. E)

·     13-222-SGP-ZZ-ZZ-DR-A-131303 – Phase 2 – Elevations (Rev. E)

·     13-222-SGP-ZZ-ZZ-DR-A-131307 – Elevation Visuals

·     Drainage Layout Drawing No. T/20/2407 Rev P5

·     Water Course Sections T-212407 60-04 Rev P3

·     Flood Risk Assessment ES Appendix 11.1 FRA V1.5

·     Impermeable Areas Plan Drg 51 02 p1 (Dwg. No. T/20/2407 51-02 Rev P1)

 

Reason: For the avoidance of doubt, to ensure that the development is carried out only as approved by the Local Planning Authority and comply with Government Guidance contained with the National Planning Policy Framework.

 

3.          The building hereby approved shall be constructed to BREEAM Excellent Standard or requirement thereof.

 

Reason: To ensure sustainable construction and to reduce carbon emissions in accordance with Policies ESD1-5 of the Cherwell Local Plan and Government guidance within the National Planning Policy Framework.

 

4.          All planting, seeding or turfing comprised in the approved details of landscaping (EDP. Drawing no. EDP2425_d017e) shall be carried out in accordance with BS 4428:1989 Code of Practice for general landscape operations (excluding hard surfaces), or the most up to date and current British Standard, in the first planting and seeding seasons following the operation of the service yard, or on the completion of the development, whichever is the sooner. Any trees, herbaceous planting and shrubs which, within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the current/next planting season with others of similar size and species.

 

Reason: In the interests of the visual amenities of the area, to ensure the creation of a pleasant environment for the development and to comply with Policy ESD 15 of the Cherwell Local Plan 2011-2031, saved Policy C28 of the Cherwell Local Plan 1996 and Government guidance contained within the National Planning Policy Framework.

 

5.          The Delivery and Servicing Plan (January 2022, included as Appendix T of Vectos Transport Assessment dated March 2022) shall be implemented in perpetuity for the operation of the development hereby approved. The Plan shall ensure the implementation of specific details on the routing of vehicles in order to ensure that larger service / delivery vehicles avoid inappropriate routes on the local road network, in order to mitigate the impact on the surrounding network.

 

Reason: In the interests of highway safety and to ensure that the environment is protected during construction in accordance with Policy ENV1 of the Cherwell Local Plan 1996 and Government guidance contained within the National Planning Policy Framework.

 

6.          Shift change overs of Production Staff will avoid start and finish times during the peak highway network hours of 08:00 – 10:00 and 16:00 – 18:00, Monday-Friday in order to mitigate the impact of the development on the local highway network during peak network hours.

 

Reason: In the interests of sustainability, to ensure a satisfactory form of development and to comply with Policies SLE4 and ESD1 of the Cherwell Local Plan 2011-2031 Part 1 and Government guidance contained within the National Planning Policy Framework.

 

7.          No energy generating equipment shall be installed within the energy centre hereby approved until an updated air quality assessment and noise impact assessment has been submitted to and approved in writing by the Local Planning Authority.

 

Reason: In the interest of residential amenity and to ensure the details are acceptable to the Local Planning Authority.

 

8.     All plant, machinery, and equipment to be used by reason of the granting of this permission, including any sound attenuating structures, shall be so installed, maintained and operated so as to ensure that the rating noise level from the site does not exceed the baseline background sound levels presented in Table 7.25 of the Environmental Statement (March 2022) and summarised below when measured at the boundary of any noise sensitive receptor. Measurement and rating of noise for the purposes of this condition shall be in accordance with BS4142:2014+A1:2019 Methods for rating and assessing industrial and commercial sound.

       

Receptor

Period

Derived Background Sound Level L (A90)

Half Mile House

Daytime

54

Night-Time

42

Green Farm Cottages

Daytime

54

Night-Time

46

Church Lane

Daytime

56

Night-Time

41

 

Reason: To ensure the creation of a satisfactory environment free from intrusive levels of noise and to comply with Policy ENV1 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.

 

9.     Surface Water Discharge from the development site shall be limited to 80% of QBAR rate up to the 1% AEP event plus an allowance of 40% for climate change (a discharge limit of 18.0 l/s). 

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

PRE-COMMENCEMENT CONDITIONS

10.   No development of any phase shall take place, including any works of demolition until a Construction Management Plan (CMP) has been submitted to and approved in writing by the Local Planning Authority for that phase. The CMP shall be appropriately titled (site and planning permission number) and shall provide for as a minimum:

o  Routing of construction traffic and delivery vehicles including means of access into the site;

o  Details of any road closures needed during construction;

o  Details of any traffic management needed during construction;

o  Details of wheel cleaning/wash facilities – to prevent mud etc, in vehicle tyres/wheels, from migrating onto adjacent highway;

o  Measures to control the emission of dust and dirt during construction;

o  Details of appropriate signing, to accord with the necessary standards/requirements, for pedestrians during construction works, including any footpath diversions;

o  The erection and maintenance of security hoarding / scaffolding if required;

o  A regime to inspect and maintain all signing, barriers etc;

o  Contact details of the Project Manager and Site Supervisor responsible for on-site works to be provided;

o  Details of the loading and unloading of plant and materials and the use of appropriately trained, qualified and certificated banksmen for guiding vehicles/unloading etc;

o  Details of arrangements for site related vehicles (worker transport etc);

o  Layout plan of the site that shows structures, roads, site storage, compound, pedestrian routes etc;

o  Any temporary access arrangements;

o  Delivery, demolition and construction working hours;

o  Storage of plant and materials used in constructing the development;

o  A scheme for recycling/ disposing of waste resulting from demolition and construction works.

 

The approved Construction Management Plan shall be adhered to throughout the construction period for the development.

 

Reason: In the interests of highway safety and to ensure that the environment is protected during construction in accordance with Policy ENV1 of the Cherwell Local Plan 1996 and Government guidance contained within the National Planning Policy Framework. This information is required prior to commencement of the development as it is fundamental to the acceptability of the scheme.

 

11.   No development shall take place (including demolition, ground works, vegetation clearance) on any phase until a Landscape and Ecological Management Plan (LEMP) for the development site has been submitted to and approved in writing by the Local Planning Authority for that phase. The LEMP will set out in detail the measures to be implemented to ensure the successful establishment/installation of new habitats/features and the long-term maintenance and management of both existing and new habitats/features proposed as part of the soft landscape scheme.

 

Reason: To protect habitats of importance to biodiversity conservation from any loss or damage in accordance with Policy ESD10 of the Cherwell Local Plan 2011 – 2031 Part 1 and Government guidance contained within Section 15 of the National Planning Policy Framework. This information is required prior to commencement of the development as it is fundamental to the acceptability of the scheme.

 

12.   No development shall take place (including demolition, ground works, vegetation clearance) until a Construction Environmental Management Plan (CEMP: Biodiversity) has been submitted to and approved in writing by the Local Planning Authority. The CEMP: Biodiversity shall include as a minimum:

o  Risk assessment of potentially damaging construction activities;

o  Identification of ‘Biodiversity Protection Zones’;

o  Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction including the control of dust (may be provided as a set of method statements);

o  The location and timing of sensitive works to avoid harm to biodiversity features;

o  The times during construction when specialist ecologists need to be present on site to oversee works;

o  Responsible persons and lines of communication;

o  The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person;

o  Use of protective fences, exclusion barriers and warning signs

 

The approved CEMP: Biodiversity shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details.

 

Reason: To protect habitats of importance to biodiversity conservation from any loss or damage in accordance with Policy ESD10 of the Cherwell Local Plan 2011 – 2031 Part 1 and Government guidance contained within Section 15 of the National Planning Policy Framework. This information is required prior to commencement of the development as it is fundamental to the acceptability of the scheme.

 

13.   No development shall take place until, a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and to inform the remediation strategy proposals shall be documented as a report undertaken by a competent person and in accordance with DEFRA and the Environment Agency's ‘Model Procedures for the Management of Land Contamination, CLR 11’ and submitted to and approved in writing by the Local Planning Authority. No development shall take place unless the Local Planning Authority has given its written approval that it is satisfied that the risk from contamination has been adequately characterised as required by this condition.

 

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy ENV12 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.

 

14.   If contamination is found by undertaking the work carried out under condition 13, prior to the commencement of the development hereby permitted, a scheme of remediation and/or monitoring to ensure the site is suitable for its proposed use shall be prepared by a competent person and in accordance with DEFRA and the Environment Agency's ‘Model Procedures for the Management of Land Contamination, CLR 11’ and submitted to and approved in writing by the Local Planning Authority. No development shall take place until the Local Planning Authority has given its written approval of the scheme of remediation and/or monitoring required by this condition.

 

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy ENV12 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.

 

15.   If remedial works have been identified in condition 14, the development shall not be occupied until the remedial works have been carried out in accordance with the scheme approved under condition 14. A verification report that demonstrates the effectiveness of the remediation carried out must be submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy ENV12 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.

 

16.   Any contamination that is found during the course of construction of the approved development that was not previously identified shall be reported immediately to the Local Planning Authority. Development on the part of the site affected shall be suspended and a risk assessment carried out and submitted to and approved in writing by the Local Planning Authority. Where unacceptable risks are found remediation and verification schemes shall be submitted to and approved in writing by the Local Planning Authority. These approved schemes shall be carried out before the relevant phase of development is resumed or continued.

 

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy ENV12 of the adopted Cherwell Local Plan and Government guidance contained within the National Planning Policy Framework.

 

17.   No development shall take place until a professional archaeological organisation acceptable to the Local Planning Authority shall prepare an Archaeological Written Scheme of Investigation, relating to the application site area, which shall be submitted to and approved in writing by the Local Planning Authority.

 

Reason: To safeguard the recording of archaeological matters within the site in accordance with the NPPF (2021).

 

18.   Following the approval of the Written Scheme of Investigation referred to in Condition 17, and prior to the commencement of the development (other than in accordance with the agreed Written Scheme of Investigation), a programme of archaeological mitigation shall be carried out by the commissioned archaeological organisation in accordance with the approved Written Scheme of Investigation. The programme of work shall include all processing, research and analysis necessary to produce an accessible and useable archive and a full report for publication which shall be submitted to the Local Planning Authority within two years of the completion of the archaeological fieldwork.

 

Reason: To safeguard the identification, recording, analysis and archiving of heritage assets before they are lost and to advance understanding of the heritage assets in their wider context through publication and dissemination of the evidence in accordance with the NPPF (2021).

 

19.   No development shall take place until, notwithstanding the details included in Woodland Management Plan edp2425_r018b (June 2022), an updated Woodland Management Plan to include a full management and replanting strategy for the ancient woodland has been submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure the ancient woodlands longevity, and unique habitat is secured.

 

20.   No development shall commence until a construction phasing plan has been submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

21.   No development shall commence until a Sustainable Surface Water Management Strategy compliance report to demonstrate how the scheme complies with the “Local Standards and Guidance for Surface Water Drainage on Major Development in Oxfordshire” shall be submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

22.   No development shall commence until a Flood Exceedance Conveyance Plan has been submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

23.   No development shall commence until results from comprehensive infiltration testing across the site to BRE DG 365 standard have been submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

24.   No development shall commence until detailed design drainage layout drawings of the SuDS proposals including cross-section details have been submitted to and approved in writing by the Local Planning Authority. The approved Drainage details shall be fully implemented prior to first occupation of each phase of the development.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

25.   No development shall commence until details of how water quality will be managed during construction and post development in perpetuity have been submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

26.   No development above ground shall take place until details of any consents for any connections into third drainage systems have been submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

PRIOR TO THE CONSTRUCTION OF WORKS ABOVE GROUND LEVEL

27.   No development above ground level shall take place until a strategy has been submitted to and agreed in writing by the Local Planning Authority which sets out how Apprenticeships and Training Opportunities will be encouraged to be provided during the construction phase. Prior to the first occupation and prior to the occupation of any subsequent occupiers of the building, a further strategy shall be submitted to and approved in writing by the Local Planning Authority which sets out how Apprenticeships and Training Opportunities will be encouraged to be provided by the occupiers of the unit. The strategies above shall include details of the number of apprenticeships and training posts, over what period of time they will be employed, where the apprentices may be placed within the company and where apprentices will be taken from. The strategies shall be implemented in accordance with the approved details.

 

Reason: In the interests of ensuring appropriate and adequate apprenticeships are made available in accordance with policy BSC7 of the Cherwell Local Plan 2011-2031, the Council’s SPD on Developer Contributions (2018) and Government guidance within the National Planning Policy Framework.

 

28.   No development above ground level shall take place on any phase until a scheme for the installation of PV panels to achieve a total power output of at least 380kWpeak on each phase has been submitted to and approved in writing by the Local Planning Authority. The scheme for each phase shall be operational prior to the first occupation of that phase and be retained in accordance with the approved plans.

 

Reason: In the interests of sustainable development, and to comply with Policies ESD1-5 of the Cherwell Local Plan 2011-2031 and Government guidance within the National Planning Policy Framework.

 

29.   A Biodiversity Net Gain will be achieved, as set out in the Biodiversity Impact Assessment edp2424_r021b (July 2022). No development above ground level shall take place until a detailed Habitat Management Plan (HMP) setting out the specific management prescriptions for each habitat type on Site, including measures for habitat creation/enhancement and ongoing management and maintenance to ensure that the target habitat quality and condition is met post-development, has been submitted to and approved by the Local Planning Authority. The approved scheme shall be implemented prior to first occupation of the building.

 

Reason: To achieve a Net Gain in biodiversity, this information is required prior to commencement as it is fundamental to the acceptability of the proposals.

 

30.   No development above ground level shall take place until details of all permeable paving have been submitted to and approved in writing by the Local Planning Authority. The development shall be undertaken in accordance with the approved details.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

31.   No development above ground level shall take place until a detailed SuDS maintenance management plan in accordance with Section 32 of CIRIA C753 including maintenance schedules for each drainage element has been submitted to and approved in writing by the Local Planning Authority.

 

Reason: To ensure that the principles of sustainable drainage are incorporated into this proposal and maintained thereafter.

 

PRIOR TO OCCUPATION

32.   Prior to the first occupation of each phase of the building hereby approved, a detailed scheme showing external illumination of that phase of building and its curtilage shall be submitted to and approved in writing by the LPA. The scheme shall be implemented as approved.

 

Reason: To ensure the satisfactory appearance of the completed development and to comply with Policy ESD15 of the Cherwell Local Plan 2011-2015, saved Policy C28 of the adopted Cherwell Local Plan 1996 and Government guidance within the National Planning Policy Framework.

                           

33.   Prior to the first occupation of the development car park facilities shall be provided on the site (as shown in drawing ref: 13-222-SGP-ZZ-ZZ-DR-A-131000 Rev V: Site Pan – Phase 1). Thereafter, the car park facilities shall be permanently retained and maintained for the parking of vehicles in connection with the development.

 

Reason: In the interests of maintaining a well-functioning road network and in accordance with Policy SLE4, ESD1 of the Cherwell Local Plan 2011-2031 Part 1 and Government advice in the National Planning Policy Framework.

 

34.   Prior to the first occupation of the development covered cycle parking facilities shall be provided on the site (as shown in drawing ref: 13-222-SGP-ZZ-ZZ-DR-A-131000 Rev V: Site Pan – Phase 1). Thereafter, the covered cycle parking facilities shall be permanently retained and maintained for the parking of cycles in connection with the development.

 

Reason: In the interests of promoting sustainable transport modes in accordance with Policy SLE4 and ESD1 of the Cherwell Local Plan 2011-2031 Part 1 and Government advice in the National Planning Policy Framework.

 

35.   Prior to first occupation of the development a Workplace Travel Plan prepared in accordance with the Framework Travel Plan (January 2022, included as Appendix S of Vectos Transport Assessment dated March 2022, to include implementation of working practices for office staff set out in ‘Healthineers Way of Working’ (December 2020) to achieve a broad 70/30 split of office/remote based working) will be submitted to and approved by the Local Planning Authority. The plan shall incorporate site specific details of the means of regulating the use of private cars related to the development in favour of other modes of transport and the means of implementation and methods of monitoring.

 

Reason: In the interests of sustainability, to ensure a satisfactory form of development and to comply with Policies SLE4 and ESD1 of the Cherwell Local Plan 2011-2031 Part 1 and Government guidance contained within the National Planning Policy Framework.

 

36.   Prior to the first occupation of the development, a record of the installed SuDs and site wide drainage scheme shall be submitted to and approved in writing by the Local Planning Authority for deposit with the Lead Local Flood Authority Asset Register. The details shall include:

a)  As built plans (.pdf and .shp file format);

b)  Photographs to document each key stage of the drainage system when installed on site.

c)   Photographs to document the completed installation of the drainage structures on site;

d)  The name and contact details of any appointed management company information.

 

Reason: In accordance with section 21 of the Flood and Water Management Act 2010.

 

 