Agenda item


Land North West Of Fabis House, Rattlecombe Road, Shenington

Decision:

Approved, subject to various requirements to be set out in the Minutes

 

Minutes:

The Committee considered application 19/00014/F for the conversion of a barn to form a new dwelling (re-submission of application 18/01114/F) at Land North West of Fabis House, Rattlecombe Road, Shenington for The Magpie Partnership Ltd.

 

In reaching their decision the committee considered the officers’ report, presentation and written update.

 

Resolved

 

That application 19/00014/F be approved and that authority be delegated to the Assistant Director for Planning and Economy to grant permission, subject to the conditions set out below (and any amendments to those conditions as deemed necessary)

 

CONDITIONS

 

Time Limit

 

1.               The development to which this permission relates shall be begun not later than the expiration of three years beginning with the date of this permission.

 

Compliance with Plans

 

2.         Except where otherwise stipulated by conditions attached to this permission, the development shall be carried out strictly in accordance with the following plans and documents:  Site Location Plan and ‘Scheme Drawings Barn A’ (P751-022X).

 

Stone walls

 

3.         The external walls of the dwellings to be constructed in stone shall be laid, dressed, coursed and pointed in strict accordance with the stone sample panel viewed on site by the planning case officer on 5th April 2018, as approved under 18/00065/DISC.

 

Slate Roof

 

4.         No externally facing tiles shall be used in the development other than in in strict accordance with the slate sample viewed on site by the planning case officer on 5th April 2018, as approved under 18/00065/DISC.

 

Window Details to be submitted

 

5.         Within one month of the date of this consent and prior to the installation of the doors, windows and rooflights, full details of the doors, windows and rooflights hereby approved, at a scale of 1:20 including a cross section, cill, lintel and recess detail and colour/finish, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the doors and windows and their surrounds, and the rooflights, shall be installed within the buildings in accordance with the approved details and shall be retained as such thereafter.

 

Parking

 

6.         The development shall not be occupied unless and until the parking and manoeuvring areas have been provided in strict accordance with set out in drawings titled 'Proposed Hard Landscaping Details' and drawing numbers '17 27251/50 P1', '17 27251/51 P1', '17 27251/52 P1' and '17 27251/53 P2', as approved under 17/00570/DISC and shall be maintained as such thereafter.

 

Surface Water Drainage

 

7.         The development shall not be occupied unless and until the surface water drainage scheme has been carried out in accordance with the details shown on Drainage Layout Design (drawing number 17 27251/50 rev P1) and Drainage Construction Details (drawing number 17 27251/51 rev P1) as approved under 18/01098/F and shall be maintained as such thereafter.

                       

Bat and Bird Mitigation Strategy

 

8.         The development shall not be occupied unless and until the bat and bird mitigation measures and the measures for enhancing swift nesting have been carried out as set out on page 8 of the 'Mitigation Strategy - Bats, Nesting Birds & Swifts' prepared by Ridgeway Ecology, dated 22nd August 2017, as approved under 17/00441/DISC and shall be retained as such thereafter.

 

Submission of Landscaping Scheme

 

9.         Within one month of the date of this consent, a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme for landscaping the site shall include:-

 

(a)       details of the proposed tree and shrub planting including their species, number, sizes and positions, together with grass seeded/turfed areas,

 

(b)       details of the hard surface areas, including pavements, pedestrian areas, reduced-dig areas, crossing points and steps,

 

(c)     details of the boundary treatments and means of enclosure, including  height, layout, materials and finished appearance.

 

The development shall be carried out in strict accordance with the approved landscaping scheme and the approved hard surface areas and boundary treatments shall be provided prior to the first occupation of the development and shall be retained as such thereafter.

 

Maintenance of Landscaping

 

10.       All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in accordance with BS 4428:1989 Code of Practice for general landscape operations (excluding hard surfaces), or the most up to date and current British Standard, in the first planting and seeding seasons following the occupation of the building(s) or on the completion of the development, whichever is the sooner. Any trees, herbaceous planting and shrubs which, within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the current/next planting season with others of similar size and species.

 

Rainwater Goods

 

11.       No rainwater goods shall be used in the development unless they are either cast iron or aluminium finished and shall be painted matt black.

 

Removal of Permitted Development Rights

 

12.       Notwithstanding the provisions of Classes A to D (inc.) of Part 1, Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 and its subsequent amendments, the approved dwellings shall not be extended or altered without the grant of further specific planning permission from the Local Planning Authority.

           

 