Decision:
Approved, subject to conditions
Minutes:
The Committee considered an application to Change of use Application – Alterations to the internal road layout, use of land for coach and car-parking, and extension of single storey storage/staff building to be used for coach drivers.
The Committee was satisfied with the evidence presented.
In reaching their decision, the Committee considered the officers’ report, presentation and written update.
Resolved
That application 12/00292/F be approved, subject to:
(1) SC1.4A Full Permission: Duration Limit (3 years) (RC2)
(2) Except where otherwise stipulated by conditions attached to this permission the development shall be carried out strictly in accordance with the following plans and documents: Planning application form; Lyons Sleeman & Hoare Planning, Design & Access Statement dated February 2012 and drawing nos. 08047/P-201, P203, P-204, P-205 and P-206; Transport Statement by Royal Haskoning dated 29 February 2012; Flood Management Plan dated 22 February 2012 and Flood Risk Assessment dated February 2012.
(3) The development permitted by this planning permission shall be carried out in accordance with the approved Flood Risk Assessment (FRA) by Clarkebond ref: WB01189/BCP/FRA dated February 2012, drawings WB01189 C 305 to 311, and the following mitigation measures detailed within the FRA:
1. Finished topographic levels shall be no higher than those shown in drawings WB01189 C 309 to 311.
2. The proposed fence will be constructed such that a 500mm clear opening is provided between ground level and the lowest rail, and the only element of the fence within the flood flow path is the fence posts, as detailed in Section 4.3.1 of the FRA.
The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority.
(4) The parking and manoeuvring areas shall be provided in accordance with the plan (08047/P-203) hereby approved and shall be constructed, laid out, surfaced, drained (SUDS) and completed, and shall be retained unobstructed except for the parking of vehicles at all times.
(5) The proposed parking area is to be in accordance with SUDS. A SUDS scheme shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby approved.
(6) Prior to any demolition and the commencement of the development a professional archaeological organisation acceptable to the Local Planning Authority shall prepare an Archaeological Written Scheme of Investigation, relating to the application site area, which shall be submitted to and approved in writing by the Local Planning Authority.
(7) Prior to any demolition on the site and the commencement of the development and following the approval of the Written Scheme of Investigation referred to in condition 5, a staged programme of archaeological evaluation and mitigation shall be carried out by the commissioned archaeological organisation in accordance with the approved Written Scheme of Investigation. The programme of work shall include all processing, research and analysis necessary to produce an accessible and useable archive and a full report for publication which shall be submitted to the Local Planning Authority.
(8) Prior to the commencement of the development hereby approved and notwithstanding the lighting details shown in the submission, revised details of the lighting installation/s (including height or lamps, position of posts, angle of lamps, levels of luminance) shall be submitted to and approved in writing by the Local Planning Authority. The lighting installation/s shall thereafter be implemented in accordance with the approved details.
(9) That the area shown as coach parking on dwg number P-206 received on 25.04.12 shall be used only for the purpose of coach parking and for no other purpose whatsoever.
Supporting documents: