Former Upton Dairy, Upton Estate, Stratford Road, Shenington

Decision:

Approved, subject to conditions

Minutes:

The Committie considered an application for the erection of one storage unit (B8 use), one business unit (B1, B2 and B8 use), associated car parking and landscaping.

 

The Committee was satisfied with the evidence presented.

 

In reaching their decision, the Committee considered the officers’ report and presentation.

 

Resolved

 

That application 11/01641/F be approved subject to the following conditions:

 

(1)               SC 1_4A (Time limit for implementation)

 

(2)               Except where otherwise stipulated by conditions attached to this permission, the development shall be carried out strictly in accordance with the following plans and documents and the materials and finishing details included therein;

                                 I.      drawing 012 Rev P3 (submitted with the application)

                               II.      drawing 013 Rev P2 (submitted with the application)

                              III.      drawing 014 Rev P2 (submitted with the application)

                           IV.      drawing 015 Rev P3 (submitted with the application)

                             V.      drawing 116 Rev P2 (submitted with the application)

                           VI.      drawing U4.5-002 – External Lighting Plan and the Dextra Avalon Wallpack data-sheet (received on 12 January 2012)

                          VII.      the details set out in the Application Forms and Design & Access Statement (submitted with the application)

 

(3)               That the transport impact of the development hereby approved shall be mitigated against by adherence to the Workplace Travel Plan for the site, dated September 2010, approved under application reference 10/00228/DISC on 21 October 2010.

 

(4)               That before the development is first occupied, the parking and manoeuvring areas shall be provided in accordance with the submitted details and shall be constructed, laid out, surfaced, drained and completed in accordance with specification details therein and shall be retained unobstructed except for the parking and manoeuvring of vehicles at all times thereafter.

 

(5)               That ‘The Heath’ building shall be used only for purposes falling within Class B8; specified in the Schedule to the Town and Country Planning (Use Classes) (Amendment) (England) Order 2005 and for no other purpose(s) whatsoever.

 

(6)               That no goods, materials, plant or machinery shall be stored, repaired, operated or displayed in the open without the prior express planning consent of the Local Planning Authority.

 

(7)               That no plant, air compressor or air extraction equipment shall be installed on the site or in the buildings without prior written consent of the Local Planning Authority.

 

(8)               The existing trees along the eastern boundary of the site shall be retained and properly maintained and that any tree which may die within five years from the completion of the development shall be replaced and shall thereafter be properly maintained in accordance with this condition.

 

(9)               That, notwithstanding the provisions of Class A of Part 8, Schedule 2 of the Town and Country Planning (General Permitted Development) Order 1995 and its subsequent amendments, the approved building shall not be extended without the prior express planning consent of the Local Planning Authority.

 

(10)          Notwithstanding the provisions of section 55 (2) (a) (i) of the Town and Country Planning Act 1990 and Class A of Part 8, Schedule 2 of the Town and Country Planning (General Permitted Development) Order 1995 and its subsequent amendments, no internal operations increasing the floor space available within the building hereby permitted shall be carried out without the prior express planning consent of the Local Planning Authority.

 

(11)          That the development shall be carried out in accordance with the contaminated land phased risk assessment and mitigation strategy approved by this authority on 11 February 2010, under submission reference 09/01861/DISC.

 

 