Agenda item


OS Parcel 1310 South of Paddington Cottage, Milton Road, Bloxham

Decision:

Approved, subject to conditions

 

Minutes:

The Committee considered a report for the variation of Condition 2 of planning application 09/01811/F – Amended details for Plot 6.

 

The Committee was satisfied with the evidence presented.

 

In reaching their decision, the Committee considered the Officers’ report, written update and presentation.

 

Resolved

 

That application 11/00096/F be approved subject to the following conditions:

 

(1)               Except where otherwise stipulated by conditions attached to this permission and where the listed plans supersede their earlier versions, the development shall be carried out strictly in accordance with the plans and documents as listed in the schedule of plans received in the department on 10 February 2010 in relation to 09/01811/F with the exception of those areas relating to plot 6 which shall be in accordance with:-

 

D267/5476/SL/01 Rev. K received by the Council 20 January 2011

D267/5476/2BDB/01 Rev. A received by the Council 20 January 2011

D267/5476/2BDB/02 Rev. B received by the Council 20 January 2011

 

(2)               That the materials used for the walls and roof of the development hereby approved shall be in accordance with the samples approved on 9 March 2011 in relation to 09/01811/F.

 

(3)               That the doors and windows used in the construction of the dwellings hereby approved shall be in accordance with the samples and details approved on 9 March 2011 in relation to 09/01811/F.

 

(4)               That the finished floor levels of the proposed dwellings shall be in accordance with the details approved on 9 March 2011 in relation to 09/01811/F.

 

(5)               That the landscaping shall be carried out in accordance with the plan nos. 395/2/02 Rev C and 395/2/03 Rev C approved in relation to 09/01811/F.

 

(6)               That all planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the building(s) or on the completion of the development, whichever is the sooner;  and that any trees and shrubs which within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent for any variation.

 

(7)               That the play area shall be installed in accordance with plan no. 395/2/05 Rev C, within the time period approved by the LPA and thereafter retained as play space.

 

(8)               That prior to the first occupation of the proposed development, the proposed means of access between the land and the highway shall be formed, laid out and constructed strictly in accordance with the specification of the means of access attached hereto, and that all ancillary works therein specified shall be undertaken in accordance with the said specification.

 

(9)               That Prior to the first occupation of the proposed development vision splays measuring 4.5 metres x 90 metres shall be provided to each side of the access.

 

(10)          That, before any of the dwellings are first occupied, the whole of the estate roads and footpaths (except for the final surfacing thereof) shall be laid out, constructed, lit and drained to the Oxfordshire County Council's "Conditions and Specifications for the Construction of Roads."

 

(11)          That, before any of the dwellings are first occupied, the proposed vehicular accesses, driveways and turning areas that serve those dwellings shall be constructed, laid out, surfaced and drained in accordance with specification details approved 9 March 2011 in relation to 09/01811/F.

 

(12)          That before the development is first occupied, the parking and manoeuvring areas shall be provided in accordance with the plan hereby approved and shall be constructed, laid out, surfaced, drained and completed in accordance with specification details approved 9 March 2011 in relation to 09/01811/F, and shall be retained unobstructed except for the parking and manoeuvring of vehicles at all times thereafter.

 

(13)          The Green Travel plan prepared by Glanville and dated November 2010 received on 18 March 2011 with the applicant’s letter dated 14 March 2011 shall be implemented and complied with.

 

(14)          Prior to the first occupation of the proposed development the required off-site works are to be constructed, laid out and to the approval of the Local Highway Authority and constructed strictly in accordance with the Highway Authority’s specifications and that all ancillary works shall be undertaken. 

 

(15)          The development shall be carried out in accordance with the Construction Environmental Management Plan (CEMP) approved 9 March 2011 in relation to 09/01811/F.  Construction work shall thereafter be carried out in accordance with the approved CEMP.

 

(16)          The development hereby permitted shall be carried out in accordance with the recommendations set out in Sections 4 and 5 of the Ecological Appraisal by Diversity dated July 2009 unless otherwise agreed in writing by the Local Planning Authority.

 

(17)          The development shall be carried out in accordance with the archaeological watching brief approved 9 March 2011 in relation to 09/01811/F.

 

(18)          With the exception of the positioning of the Geocellular storage within the play area the development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA)  dated November 2009, carried out by Stuart Michael Associates ref 307.FRA&DS and the following mitigation measures detailed within the FRA:

 

Limiting the surface water run-off rate generated by the development to 3.4l/s/ha so that it will not exceed the run-off from the undeveloped site and not increase the risk of flooding off-site.

                                                                 

Providing sufficient attenuation for a volume of 697m3 so that it will not exceed the run-off volume from the undeveloped site and not increase the risk of flooding off-site.

                                                                 

All adoptable roads and parking areas will be permeable paving and all dwellings will have water butts.

 

(19)          That the development shall be carried out in accordance with the revised Surface Water Drainage Strategy plan approved 9 March 2011 in relation to 09/01811/F. 

 

(20)          That the public art shall be installed at the same time as the laying out of the play equipment in accordance with the details approved in relation to Condition 26 of 09/01811/F on 13 October 2011.

 

                                                                             

 

 