18 Bridge Street, Banbury

Decision:

Approved, subject to various requirements to be set out in the Minutes

Minutes:

The Committee considered application 17/00288/F for the four storey extension to existing building to create 10 self-contained apartments for Brickmort Developments at 18 Bridge Street, Banbury.

 

In reaching their decision, the Committee considered the officers report and presentation.

 

Resolved

 

That application 17/00288/F be approved, subject to the following conditions:

 

1                The development to which this permission relates shall be begun not later than the expiration of three years beginning with the date of this permission.

             

2                Except where otherwise stipulated by conditions attached to this permission, the development shall be carried out strictly in accordance with Drawing Numbers 12659-LP100, 12659-E001-G, 12659-E002-C and 12659-E003-C.

             

3                Prior to the commencement of the development hereby approved, and notwithstanding the submitted details, a revised schedule of the materials and finishes, including samples where applicable, for the external walls and roofs of the development shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved materials.

             

4                Prior to the commencement of the development hereby approved, full details of the refuse bin storage for the site, including location and compound enclosure details, shall be submitted to and approved in writing by the Local Planning Authority.  Thereafter and prior to the first occupation of the dwellings, the refuse bin storage area shall be provided in accordance with the approved details and retained unobstructed except for the storage of refuse bins.

             

5                Prior to the commencement of the development, full details of the doors and windows proposed, at a scale of 1:20 including a cross section, cill, lintel and recess detail and colour/finish, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the doors and windows shall be installed within the building in accordance with the approved details.

             

6                Prior to the first occupation of the development hereby approved, covered cycle parking facilities shall be provided on the site in accordance with details which shall be firstly submitted to and approved in writing by the Local Planning Authority.  Thereafter, the covered cycle parking facilities shall be permanently retained and maintained for the parking of cycles in connection with the development.

             

7                Prior to the commencement of the development hereby approved, full specification details (including construction, layout, surfacing and drainage) of the turning area and parking spaces within the curtilage of the site, arranged so that motor vehicles may enter, turn round and leave in a forward direction and vehicles may park off the highway, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development. Thereafter, and prior to the first occupation of the development, the turning area and car parking spaces shall be constructed in accordance with the approved details and shall be retained for the parking and manoeuvring of vehicles at all times thereafter.

             

8                Prior to the commencement of the development hereby approved, a car park management plan which demonstrates how car park spaces will be allocated to residents, and how parking restrictions shall be enforced within the development, shall be submitted to and approved in writing by the Local Planning Authority.  Thereafter and prior to the first occupation of the development, the car park spaces shall be allocated to residents and parking restrictions shall be implemented in strict accordance with the approved car park management plan.

             

9                Notwithstanding the details submitted and prior to the commencement of the development hereby approved, full details of the pedestrian access to the site from Bridge Street (adjacent to 15 - 17 Bridge Street), including specification details of the proposed pedestrian gate (which is considered to provide an element of public art within the site) and access arrangements, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, and prior to the first occupation of the development, the pedestrian access gate shall be installed, and the pedestrian access permanently retained and maintained in accordance with the approved details.

             

10             Prior to the commencement of the development hereby approved, full details of the fire hydrants to be provided or enhanced on the site shall be submitted to and approved in writing by the Local Planning Authority. Thereafter and prior to the first occupation of the development, the fire hydrants shall be provided or enhanced in accordance with the approved details and retained as such thereafter.

             

11             Notwithstanding the submitted details and prior to the commencement of the development hereby approved, a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme for landscaping the site shall include:-

             

              (a)     details of the proposed tree and shrub planting including their species, number, sizes and positions, together with grass seeded/turfed areas,

              (b)     details of the existing trees and hedgerows to be retained as well as those to be felled, including existing and proposed soil levels at the base of each tree/hedgerow and the minimum distance between the base of the tree and the nearest edge of any excavation,

              (c)     details of the hard surface areas, including pavements, pedestrian areas, reduced-dig areas, crossing points and steps.

              Thereafter, the development shall be carried out in strict accordance with the approved landscaping scheme.

             

12             All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in accordance with BS 4428:1989 Code of Practice for general landscape operations (excluding hard surfaces), or the most up to date and current British Standard, in the first planting and seeding seasons following the occupation of the building(s) or on the completion of the development, whichever is the sooner. Any trees, herbaceous planting and shrubs which, within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the current/next planting season with others of similar size and species.

             

13             Prior to the commencement of the development hereby approved, full details of a scheme for acoustically insulating all habitable rooms within the apartments such that internal noise levels do not exceed the criteria specified in Table 4 of the British Standard BS 8233:2014, 'Guidance on sound insulation and noise reduction for buildings', shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, and prior to the first occupation of development, the apartments shall be insulated and maintained in accordance with the approved details.

             

14             Prior to the commencement of the development, a Construction Environment Management Plan (CEMP), which shall include details of the measures to be taken to ensure construction works do not adversely affect residential properties on, adjacent to or surrounding the site together with details of the consultation and communication to be carried out with local residents shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with approved CEMP.

             

15             Prior to the commencement of the development hereby permitted a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model shall be carried out by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and shall be submitted to and approved in writing by the Local Planning Authority. No development shall take place until the Local Planning Authority has given its written approval that it is satisfied that no potential risk from contamination has been identified.

             

16             If a potential risk from contamination is identified as a result of the work carried out under condition 15, prior to the commencement of the development hereby permitted, a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and to inform the remediation strategy proposals shall be documented as a report undertaken by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and submitted to and approved in writing by the Local Planning Authority. No development shall take place unless the Local Planning Authority has given its written approval that it is satisfied that the risk from contamination has been adequately characterised as required by this condition.

             

17             If contamination is found by undertaking the work carried out under condition 16, prior to the commencement of the development hereby permitted, a scheme of remediation and/or monitoring to ensure the site is suitable for its proposed use shall be prepared by a competent person and in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11' and submitted to and approved in writing by the Local Planning Authority. No development shall take place until the Local Planning Authority has given its written approval of the scheme of remediation and/or monitoring required by this condition.

             

18             If remedial works have been identified in condition 17, the development shall not be occupied until the remedial works have been carried out in accordance with the scheme approved under condition 17. A verification report that demonstrates the effectiveness of the remediation carried out must be submitted to and approved in writing by the Local Planning Authority.

             

19             If, during development, contamination not previously identified is found to be present at the site, no further development shall be carried out until full details of a remediation strategy detailing how the unsuspected contamination shall be dealt with has been submitted to and approved in writing by the Local Planning Authority. Thereafter the remediation strategy shall be carried out in accordance with the approved details.

             

20             No development shall commence until a Construction Traffic Management Plan has been submitted to and approved in writing by the Local Planning Authority. This plan shall include wheel washing facilities, a restriction on construction & delivery traffic during the peak traffic periods, details of construction vehicle parking/waiting areas, compound details as well as an agreed route for HGV traffic to the development site. The approved Plan shall be implemented in full throughout the entirety of the construction phase of the development.