Agenda item


Proposed Himley Village North West Bicester, Middleton Stoney Road, Bicester, Oxfordshire

Decision:

Approved, subject to various requirements to be set out in the Minutes

Minutes:

The Committee considered application 14/02121/OUT, an outline application for a development to provide up to 1,700 residential dwellings (Class C3), a retirement village (Class C2), flexible commercial floorspace (Classes A1, A2, A3, A4, A5, B1, C1 and D1), social and community facilities (Class D1), land to accommodate one energy centre and land to accommodate one new primary school (up to 2FE) (Class D1). Such development to include provision of strategic landscape, provision of new vehicular, cycle and pedestrian access routes, infrastructure and other operations (including demolition of farm buildings on Middleton Stoney Road) for Portfolio Property Partners Ltd.

At the proposed Himley Village North West Bicester, Middleton Stoney Road, Bicester, Oxfordshire.

 

In reaching their decision, the Committee considered the officers report, presentation and written update.

 

Resolved

 

That application 14/02121/OUT be approved subject to:

 

 i.       Finalisation of a programme that has been received by the local authority, agreed and supported by Network Rail and the Local Highway Authority, that provides confirmation that the proposed road and tunnels under the railway at NW Bicester can be provided 2019/2020 prior to the issue of the planning permission.

 

ii.       The completion of a legal agreement in accordance with the attached Heads of Terms (annex to the Minutes as set out in the Minute Book), including delegation provided to Officers to negotiate the agreement, including the following requirement with regard to phasing;

 

iii.       The following set of conditions with delegation provided to the Head of Public Protection and Development Management to negotiate final amendments to the wording of conditions following a detailed review by Officers;

 

1.         No more than 500 dwellings shall commence and be occupied until either;

 

a)         The realigned Howes Lane and tunnel under the railway (as permitted under application 14/01968/F or such other application for the road and tunnel that has been approved) has been provided and is open to all traffic or;

 

b)    The realigned Howes Lane and tunnel under the railway (as permitted under application 14/01968/F or such other application for the road and tunnel that has been approved) is subject to all necessary consents and approvals, such that there is certainty over the programme for its delivery and agreement is in place between the applicant and Cherwell District Council and the Local Highway Authority as to the phasing of the remaining 1200 dwellings and associated infrastructure the subject of application 14/02121/OUT

 

2.           In the case of the reserved matters, application for approval shall be made for the first residential phase of development not later than the expiration of five years beginning with the date of this permission.

 

3.           In the case of all other reserved matters, in respect of subsequent phases, application for approval shall be made not later than the expiration of seven years beginning with the date of this permission.

 

4.           The development to which this permission relates shall be begun not later than the expiration of two years from the approval of the first residential phase reserved matter and for all other matters two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last reserved matters to be approved.

 

5.           Except where otherwise stipulated by condition, the development shall be carried out in broad accordance with the following plans and documents:

        Site Boundary Parameter Plan 1 (drawing number 592-PL-101 Rev B);

        Demolitions Parameter Plan 2 (drawing number 592-PL-102 Rev B);

        Land Use Parameter Plan 4 (drawing number 592-PL-103 Rev E);

        Building Heights Parameter Plan 5 (drawing number 592-PL-104 Rev D);

        Density Parameter Plan 6 (drawing number 592-PL-105 Rev D);

        Landscape Parameter Plan 3 (drawing number 592-PL-106 Rev C);

        Movement and Access Parameter Plan (drawing number 1665/75/04;

        SUDs Parameter Plan (drawing number 1665/75/05 Rev B);

        Document titled ‘Storage Attenuation Volumes of Primary Swales (1665/76) dated July 2015;

        Tree Survey Report – document reference EED14995-100-R-7-1-3-TA dated January 2015 and accompanying appendices;

        Sustainability and Energy Statement – document reference PENL2003 dated 17 December 2014

        Surface Water Drainage Strategy and Flood Risk Assessment dated December 2014 and all additional correspondence relating to Drainage and Flood Risk.

 

6.           Prior to the submission of the first reserved matters application, a phasing plan covering the entire site the subject of this application, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter each reserved matters application shall refer to a phase, phases, or part thereof identified in the approved phasing plan and development shall proceed in accordance with the approved phasing.

 

7.           No more than 1700 dwellings falling within Use Class C3 shall be erected within the site.

 

8.           No more than 100 dwellings falling within Use Class C2 shall be erected within the site.

 

9.           No more than a total of 8,000sqm floor space shall be provided for the mixed uses set out in Table 1 and each use shall not exceed the maximum Gross Internal Area for that specified use. These uses shall only be provided within the areas of the site annotated for ‘Other Uses and ‘Social/ Community’ on ‘Land Use Parameter Plan 4’ drawing number 592-PL-103 Rev E.

 

Table 1

Land Use    Maximum GIA (sqm)

Hotel (Class C1)    2,600sqm

Veterinary surgery (Class D1)     2,000sqm

Pub/ Community (Classes A4/ D1)        400sqm

Retail (Classes A1, A2, A3, A4, A5)       700sqm

Office (Class B1)   1,000sqm

Health facility (Class D1)1,500sqm

Nursery (Class D1)            100sqm

Energy Centre (Sui Generis)       375sqm

Water treatment plant (Sui Generis)       450sqm

 

The approved uses shall remain within the Use Classes set out above

 as specified in the Schedule to the Town and Country Planning (Use

Classes) (Amendment) (England) Order 2005 and for no other

purpose(s) whatsoever.

 

10.         No individual retail unit shall exceed 150 sq m in gross floor internal area with the exception of a single unit of a maximum of 300 sq m for a convenience store. Thereafter retail units shall not be amalgamated such that any individual unit exceeds 150 sq m or 300 sq m respectively.

 

Design

 

11.         Prior to the submission of the first reserved matters application, an Urban Design Framework shall be submitted to and approved in writing by the Local Planning Authority. The Urban Design Framework shall set out the urban design approach for the site to include a regulating plan and supporting information to include;

 

        Details to provide continuity with adjacent development

        Key approaches to deliver sustainable development that as a minimum meets the Eco Town PPS standards

        Character areas for built form and green spaces and their key features

        Indicative block size, structure and permeability

        Movement network and streetscape including bus routes and stop locations

        Public realm

        Density and open space

        Building heights

        Key views, vista, landmarks, landscape character, trees and retained hedges

        Legibility and diversity of built form and landscape

        Adaptability

        Play provision in accordance with Adopted Cherwell Local Plan Policy BSC 11

 

No reserved matters shall be submitted until the urban design framework has been approved in writing by the Local Planning Authority. All reserved matters applications and development shall thereafter be in accordance with the approved Urban Design Framework.

 

12.         Prior to the submission of the first reserved matters application, a detailed masterplan for the area fronting the Middleton Stoney Road annotated as ‘Other Uses’ on Land Use Parameter Plan 4 drawing number 592-PL-103 Rev E, shall be submitted to and approved in writing by the Local Planning Authority. Reserved Matter applications for the area covered by the Masterplan shall be in accordance with the approved Masterplan. The masterplan shall show the location of each of the land uses, access and parking locations, key frontage and public space conditions and landscape principles.

 

13.         Prior to the submission of the first reserved matter in each of the character areas containing built form, identified in the approved Urban Design Framework, a design code shall be provided for the whole of that character area which shall include;

        Street types, materials and details

        Block Principles

        Landscape, materials and details

        Boundary treatments

        Building types and Uses

        Building heights

        SUDS, parks and open spaces

        Building Materials and Details

        Highway design details

        Parking Strategy

 

No reserved matters shall be submitted for that character area until the design code has been approved in writing by the Local Planning Authority. The development in the character area shall thereafter be in accordance with the approved design code.

 

14.         Each reserved matter submission for built development shall be accompanied by details showing how Building for Life 12 has been used to inform the design process and that the scheme achieves Built for Life™.

 

15.         In accordance with the parameter plans hereby approved, the following shall be provided:

        A 20m Green Infrastructure strip (which shall not include residential gardens) shall be provided to the west of the boundary with Lovelynch House;

        A 20m ‘no build’ buffer shall be provided to the north of the boundary with Lovelynch House;

        A 30m ‘no build’ buffer (narrowing to a 20m along the northern section of the eastern boundary) shall be provided to the east of the boundary with Lovelynch House. This buffer shall include a 10m hedgerow buffer.

 

Dwellings

 

16.         Prior to the submission of a reserved matters application for residential development a schedule of the market housing to be provided to meet local housing needs in each phase of the development shall be submitted to and approved in writing by the Local Planning Authority. The market housing shall thereafter be provided in accordance with the approved schedule (and detailed reserved matter approval) unless otherwise agreed in writing by the Local Planning Authority.

 

17.         All dwellings shall be provided with real time energy and travel information prior to occupation unless otherwise agreed in writing by the Local Planning Authority. Details for each phase shall be submitted to the Local Planning Authority and agreed in writing prior to the commencement of construction of dwellings.

 

18.         Each reserved matters application shall be accompanied by a statement setting out how the design of buildings and the layout has taken account of future climate impacts, as identified in TSB research ‘Future Climate Change Risks for NW Bicester’, or any more recent assessment that has been published, and how the proposed development will be resilient to overheating, changing rainfall patterns and higher intensity storm events.

 

19.         Prior to the commencement of each phase, those areas of the site that are subject to elevated levels of noise, principally from road traffic sources as set out in the Environmental Statement, shall be identified and the dwellings that are constructed in these areas must be designed and constructed in such a manner that they contain elements of sound insulation that will ensure that the internal noise levels contained within BS 8233:2014 Table 4 can be achieved.

 

20.         Noise levels from any mechanical plant and the energy centre shall not exceed the noise emission limits contained within table 10.15 of the Environmental Statement. Any reserved matters submission for the energy centre or for development that will include mechanical plant shall include details of how the noise emission limits for that development will be met. 

 

Phase conditions

 

21.         All phases of development shall be provided with high speed broad band (not less than 100mbs); such that on occupation of each building on the phase the occupiers can secure a high speed broad band connection.

 

22.         No development shall commence on construction of any development approved by a reserved matter until a report has been submitted outlining how carbon emissions from the construction process and embodied carbon have been minimised. No work shall commence until the report has been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the plan.

 

Transport

 

23.         Each reserved matters application shall include full details of the means of vehicular accesses between the land and the highway, including, position, layout, construction, drainage and vision splays. Thereafter, the means of access shall be constructed and retained in accordance with the approved details.

 

24.         Each reserved matters application shall include full details of the means of footway and cycleway links between the land and the local highway network, including, position, layout, construction, drainage and street lighting.  Thereafter, the means of footway and cycleway links shall be constructed and retained in accordance with the approved details.

 

25.         The pedestrian and cycle routes shall be signed in accordance with details to be submitted to and agreed in writing by the Local Planning Authority prior to the first occupation of any dwellings. The signage shall then be provided for each route prior to its first use.

 

26.         No development shall commence on a phase until a Construction Traffic Management Plan providing full details of the phasing of the construction of that phase has been submitted to and approved in writing by the Local Planning Authority (in consultation with the Local Highway Authority). This plan is to include wheel washing facilities, a restriction on construction & delivery traffic during the peak traffic periods and an agreed route for HGV traffic to the development site. The approved Plan shall be implemented in full during the entire construction period of the phase.

 

27.         Each reserved matter application shall be accompanied by a Travel Plan setting out how the development will enable at least 50 per cent of trips originating within the development to be made by non-car means, with the potential for this to increase over time to at least 60 per cent, in accordance with the Eco Towns PPS ET 11.2 (a). The Travel Plan shall be submitted to and agreed in writing by the Local Planning Authority prior to any occupations and the actions of the travel plan shall thereafter be delivered in accordance with the Travel Plan.

 

Contamination

 

28.         Prior to the commencement of the development hereby permitted a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model shall be carried out by a competent person and in accordance with DEFRA and the Environment Agency's ‘Model Procedures for the Management of Land Contamination, CLR 11’ and shall be submitted to and approved in writing by the Local Planning Authority. No development shall take place until the Local Planning Authority has given its written approval that it is satisfied that no potential risk from contamination has been identified.

 

29.         If a potential risk from contamination is identified as a result of the work carried out under condition [28], prior to the commencement of the development hereby permitted, a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and to inform the remediation strategy proposals shall be documented as a report undertaken by a competent person and in accordance with DEFRA and the Environment Agency's ‘Model Procedures for the Management of Land Contamination, CLR 11’ and submitted to and approved in writing by the Local Planning Authority. No development shall take place unless the Local Planning Authority has given its written approval that it is satisfied that the risk from contamination has been adequately characterised as required by this condition.

 

30.         If contamination is found by undertaking the work carried out under condition [29], prior to the commencement of the development hereby permitted, a scheme of remediation and/or monitoring to ensure the site is suitable for its proposed use shall be prepared by a competent person and in accordance with DEFRA and the Environment Agency's ‘Model Procedures for the Management of Land Contamination, CLR 11’ and submitted to and approved in writing by the Local Planning Authority. No development shall take place until the Local Planning Authority has given its written approval of the scheme of remediation and/or monitoring required by this condition.

 

31.         If remedial works have been identified in condition [30], the development shall not be occupied until the remedial works have been carried out in accordance with the scheme approved under condition [30]. A verification report that demonstrates the effectiveness of the remediation carried out must be submitted to and approved in writing by the Local Planning Authority.

 

32.         Piling or any other foundation designs using penetrative methods within any area identified as being subject to risk from contamination shall not be permitted other than with the express written consent of the Local Planning Authority, which may be given for those parts of the site where it has been demonstrated that there is no resultant unacceptable risk to groundwater quality. The development shall be carried out in accordance with the approved details.

 

33.         If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until a remediation strategy has been submitted to the local planning authority. The remediation strategy shall detail how this unsuspected contamination shall be dealt with and written approval from the local planning authority shall be obtained. The remediation strategy shall be implemented as approved.

 

34.         The development hereby permitted shall not be commenced until such time as a pollution prevention scheme to dispose of contaminated surface water has been submitted to, and approved in writing by, the local planning authority. The scheme shall be implemented as approved.

 

Biodiversity

 

35.         No development shall commence on a phase unless or until an up to date ecological survey has been undertaken to establish changes in the presence, abundance and impact on bio diversity within that phase. The survey results, together with any necessary changes to the mitigation plan or method statement shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, the development shall be carried out in accordance with the approved details.

 

36.         The retained hedges shall have a buffer a minimum of 20m in width comprising of 10m either side of the retained hedge except where they form part of a dark corridor where the buffers shall extend to a minimum width of 40m comprising of 20m either side of the retained hedge, and the woodlands shall have a buffer around their perimeter a minimum of 10m in width when measured from the canopy edge, unless otherwise agreed in writing by the Local Planning Authority. The hedge and woodland buffers shall be maintained as public open space and managed to maintain and create bio diversity.

 

37.         No development shall commence on a phase until details of any existing hedgerow, or part thereof, to be removed, and proposals for creation of new compensatory hedgerow, have been submitted to and approved in writing by the Local Planning Authority. The compensatory hedgerow shall be provided in accordance with the approved details.

 

38.         No development shall commence on a phase until a scheme for the provision of protective fencing, to prevent damage during construction, for the retained hedgerows, trees, woodlands, ponds and areas of green space, has been submitted to and approved in writing by the Local Planning Authority. The approved fencing shall be installed in accordance with the approved plans prior to work commencing on site.

 

39.         A protection area for Newts, a minimum of 50m in circumference, around the two ponds on the site and the land between them shall be provided in accordance with that shown on ‘Landscape Parameter Plan 3’ drawing number 592-PL-106 Rev C. No removal of suitable aquatic and terrestrial habitat within 250m of the breeding ponds shall be carried out unless otherwise agreed in writing by the Local Planning Authority.

 

40.         Prior to the submission of the first reserved matters application, a Bio Diversity Strategy for the site shall be submitted and approved in writing by the local planning authority. Each reserved matter application shall be accompanied by a statement setting out how the proposed development will contribute to achieving the Bio Diversity Strategy and net biodiversity gain. The development shall be carried out in accordance with approved the biodiversity statement.

 

41.         No development shall commence on a phase until a Landscape & Habitat Management Plan (LHMP) for that phase detailing both management and monitoring proposals for green space (excluding building curtilages) has been submitted to and approved in writing by the Local Planning Authority and thereafter the LHMP shall be implemented in accordance with the approved details.

 

42.         No development shall commence on a phase until a Construction Environment Management Plan (CEMP), which shall include details of the measures to be taken to ensure construction works in that phase do not adversely affect the existing biodiversity of the site and residential properties on, adjacent to or surrounding the site together with details of the consultation and communication to be carried out with local residents has been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with approved CEMP.

 

43.         No development shall commence on a phase until a Soil Resources Plan that details the soils present, proposed storage locations, handling methods and locations for reuse, within that phase, shall be submitted to and approved in writing by the local planning authority and thereafter the development shall be carried out in accordance with the approved plan.

 

44.         No development shall commence on a phase until details of existing and proposed levels for that phase have been submitted to and approved in writing by the local planning authority. The development shall thereafter be carried out in accordance with the approved levels.

 

45.         Prior to the commencement of a phase, an Arboricultural Method Statement (AMS), undertaken in accordance with BS:5837:2012 and all subsequent amendments and revisions including details of tree protection shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, all works on site shall be carried out in accordance with the approved AMS with all tree protection erected prior to development commencing on that phase.

 

Archaeology

 

46.         Prior to any demolition on the site, the commencement of the development and any archaeological investigation, a professional archaeological organisation acceptable to the Local Planning Authority shall prepare a first stage archaeological Written Scheme of Investigation, relating to the application area, which shall be submitted to and approved in writing by the Local Planning Authority.

 

47.         Prior to any demolition on the site (other than in accordance with the agreed Written Scheme of Investigation) and prior to the commencement of the development and following the approval of the first stage Written Scheme of Investigation referred to in condition [46], a programme of archaeological evaluation, investigation and recording of the application area shall be carried out by the commissioned archaeological organisation in accordance with the approved first stage Written Scheme of Investigation.

 

Outdoor Sport (The requirement for these conditions is being checked   with Sport England)

 

48.         No development shall commence until details for the phasing of the provision of the sports pitches has been submitted to and approved in writing by the Local Planning Authority [after consultation with Sport England]. The development hereby permitted shall not be carried out other than in accordance with the approved details.

 

49.         No development shall commence on the provision of the sports pitches until details of the design and layout of the sports facilities serving that phase have been submitted to and approved in writing by the Local Planning Authority [after consultation with Sport England]. The sports facilities shall not be constructed other than substantially in accordance with the approved details.

 

50.         The playing field/s and pitch/es shall be constructed and laid out in accordance with the standards and methodologies set out in the guidance note "Natural Turf for Sport" (Sport England, 2011), and shall be made available for use in accordance with the agreed phasing unless agreed in writing by the Local Planning Authority.

 

Drainage

 

51.         Prior to the commencement of development impact studies of the existing water supply infrastructure shall be submitted to, and approved in writing by, the local planning authority (in consultation with Thames Water). The studies should determine the magnitude of any new additional capacity required in the system and a suitable connection point.

 

52.         Prior to the commencement of the development, a foul drainage strategy for conveyance and treatment, detailing any on and/or off site drainage works, shall be submitted to and approved by the local planning authority. No discharge of foul or surface water from the site shall be accepted into the public system until the drainage works referred to in the strategy have been completed. No dwelling shall be occupied until the foul drainage has been provided in accordance with the approved strategy.

 

53.         Prior to the submission of the first reserved matters application, a full surface water strategy for the application site, in accordance with the Flood Risk Assessment hereby approved, shall be submitted to and approved in writing by the Local Planning Authority (in consultation with Oxfordshire County Councils Drainage Team & Natural England). The development shall be carried out in accordance with the approved Drainage Strategy.

 

54.         In addition to the site wide detailed surface water drainage strategy, each reserved matters application shall be accompanied by a detailed surface water drainage scheme, to meet the flood risk, water quality, green infrastructure and biodiversity requirements of the site. The detailed surface water drainage scheme shall be in compliance with the approved Flood Risk Assessment, Surface Water Drainage Strategy and the Masterplan Surface Water Drainage Strategy and the approved site wide detailed surface water drainage strategy. No development shall commence until the detailed reserved matter surface water drainage scheme has been approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved scheme.

 

55.         The development shall be constructed so as to achieve a demand for potable water that does not exceed 110 l/p/d and details of measures to be used to achieve this demand shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of each phase. The development shall be carried out in accordance with the details so approved.

 

56.         Prior to the commencement of the development, details of the strategy to work towards water neutrality, in accordance with the Eco Towns PPS shall be submitted to and approved in writing by the Local Planning Authority. Each reserved matters application shall demonstrate how it meets the approved strategy.

 

Employment

 

57.         All non-residential buildings shall be constructed to BREEAM Excellent.

 

Waste

 

58.         Prior to the commencement of a phase, a Site Waste Management Plan, targeting zero waste to landfill, shall be submitted to and approved in writing by the Local Planning Authority. The approved Site Waste Management Plan shall thereafter be implemented in accordance with the approved details.

 

59.         No waste shall be brought to the site for the purpose of use within any future energy centre.

 

60.         Notwithstanding the submitted drawing titled ‘Building Heights – Parameter Plan 5’ (drawing number 592-PL-104 Rev D), the maximum height at the north of the site (indicated in dark orange) shall not exceed 17m.

 

 